PATENTS / APPLICATIONS

Patent status of our projects.

Granted patents, registered applications and technical readiness are tracked separately. The gold programme is at the research stage.

3utility model patents in force
6filed applications for the featured projects
1gold research programme

Patents checked in the FIPS registers on 11.11.2026. Acceptance of an application does not mean a patent has been granted. A patent does not replace manufacture and testing of a physical prototype.

Scroll the table to the right to see document details and links.

Patents and applications for YASNOCORE projects
DevelopmentTechnical stagePatent / applicationEvidence
ПМ-1 — computing device power supplyPatent and designPatent RU246523U1 dated 14.10.2026; in force.Sources ↗
ПМ-3 — thermal control with heat recoveryPatent and designPatent RU246505U1 dated 14.10.2026; in force.Sources ↗
Power converter service assemblyPatent and designPatent RU246491U1 dated 13.10.2026; in force.Sources ↗
YASNOCORE Sintez — digital equipment roundsWorking software moduleInvention application No. 2026132208 dated 22.10.2026 was accepted and registered by FIPS. A patent grant is not confirmed.Sources ↗
ПМ-2 — optical gateway and decision loggerDesign and patent examinationApplication No. 2026123823 dated 01.08.2026. A patent grant is not confirmed.Sources ↗
Sectional electric generatorDesign and calculation planApplication No. 2026128175 dated 15.09.2026. A patent grant is not confirmed.Sources ↗
Power cassetteDesignApplication No. 2026128712 dated 20.09.2026. A patent grant is not confirmed.Sources ↗
Magnetic suspension V4Design and researchApplication No. 2026128713 dated 20.09.2026. A patent grant is not confirmed.Sources ↗
MG3-10 R2 — generator-set researchDesign and validation programmeApplication No. 2026128936 dated 22.09.2026. A patent grant is not confirmed.Sources ↗

Additional application

Industrial design — application No. 2026504134 dated 26.07.2026. The application was accepted; a patent grant is not confirmed. The verified materials do not establish a link to a specific project, so no separate project card has been created.

Legal register entry ↗

Gold research

A 50-day work programme is prepared. Producing a physical sample of the formulation, obtaining test results and patenting are future stages; a patent for the formulation is not yet confirmed.

Research programme ↗