CHALLENGE AND SOLUTION
What we are developing
Supply power to a computing load at an energy facility.
Support controlled shutdown when power is lost.
Link power status to saving computation results.
- Two external power channels in the described architecture.
- An energy buffer and power status monitoring.
- The patent description is distinguished from new configurations.
DEVELOPMENT STATUS
Where the project stands
Current confirmed stage
Patented solution described; manufacture and prototype specifications require separate confirmation
Next work
Define requirements for the load and input supplies. / Perform calculations and build the agreed prototype. / Test switching, backup power and correct task completion.
Validation and delivery of results
The test programme and acceptance criteria are defined for each project. A patent alone does not mean this stage is complete.
The patent does not confirm manufacture or testing of the assembly. A proposed 380 V configuration cannot automatically be equated with the granted claims. Operating ranges and backup duration must be tested with a specific load.
Next step
- Define requirements for the load and input supplies.
- Perform calculations and build the agreed prototype.
- Test switching, backup power and correct task completion.
INTELLECTUAL PROPERTY RIGHTS
Documented status
Patent RU246523U1 dated 14.10.2026; in force. Status checked in the public FIPS register on 11.11.2026.
Rights information and technical readiness are shown separately. A patent or registration certificate is not a test report.
PUBLIC EVIDENCE
Documents and sources
Patent RU246523U1 dated 14.10.2026; in force.
- FIPS register ↗
- Official publication (PDF) ↗
- Patents and applications in the YASNOCORE legal register ↗