Electromechanics

ПМ-2 — optical gateway and decision logger

A data exchange and logging assembly for an isolated computing system. The design combines an optical interface, access controls and a record of significant system decisions.

Design and patent examinationShowcase updated 11 November 2026
YASNOCORE / Electromechanics

CHALLENGE AND SOLUTION

What we are developing

Enable controlled data exchange for an isolated computing environment.

Log significant actions and decisions.

Validate the hardware architecture against customer scenarios.

  • A proposed optical interface.
  • Access control for service operations.
  • Event and decision logging within the architecture.

DEVELOPMENT STATUS

Where the project stands

  1. Current confirmed stage

    Design documentation; response to an examination request submitted on 27.10.2026

  2. Next work

    Refine the threat model and data exchange boundaries. / Agree on interface and log requirements. / Build a prototype and test the specified scenarios.

  3. Validation and delivery of results

    The test programme and acceptance criteria are defined for each project. A patent alone does not mean this stage is complete.

Information security certification and the protection level are not confirmed. A design visual is not a manufactured prototype. Responding to an examination request does not mean a patent has been granted.

Next step

  • Refine the threat model and data exchange boundaries.
  • Agree on interface and log requirements.
  • Build a prototype and test the specified scenarios.

INTELLECTUAL PROPERTY RIGHTS

Documented status

Application No. 2026123823 dated 01.08.2026. Submission of amended materials for examination was confirmed on 27.10.2026. A patent grant is not confirmed in the verified sources.

Rights information and technical readiness are shown separately. A patent or registration certificate is not a test report.

PUBLIC EVIDENCE

Documents and sources

Application No. 2026123823 dated 01.08.2026. A patent grant is not confirmed.

Public sources checked on 11.11.2026. The scope of rights and compatibility is defined by the relevant document.